Guardian House |
 |
A large project involving the refrubishment of 1700 sqft of
office and warehousing space. The offices were completly redesigned.
All electrical, heating, plumbing and air conditioning were replaced. |
CBS Case Study - Guardian House.pdf (2.64 Mb) |
|
Carina & Gemini |
 |
A complete refurbishment of the heating and air conditioning in two office buildings with a combined area of 2160m2 in Milton Keynes. |
CBS Case Study - Carina & Gemini.pdf (429 Kb) |
|
Cincom |
 |
The replacement of a twin compressor chiller, which provides chilled water to fan coil units throughout a prestigious three story office block in Maidenhead. |
CBS Case Study - Cincom.pdf (424 Kb) |
|
All Saints Church |
 |
| CBS had to overcome limited access to the installation site and all the usual problems associated with working in a Grade 2 listed church to successfully install a replacement boiler. |
CBS Case Study - All Saints Church.pdf (1.4 Mb) |
|